Clark Shores Association

Special Road Meeting May 2004
Home
Annual Turkey Penny Sale
About Us
Directors
Recent and Upcoming Events
Committees
Minutes of the Meetings
Financial Reports
Beach Analysis Reports
Boat Ramp Keys
Photo Gallery
Waste Water Study
Clark Shores By-Laws

May 16, 2004 Minutes of the Special Meeting ~ Called to order at 10:05 AM

Roll Call: Present: Jim Silva, Christine Silva, Mark Sutherland, Beth Amaral, Tom Moran, Bob Rounds, Nancy Jones, Neal O’Neill (S), Dave Gebo, Pat Cocozza, Justin Graham, Patricia Welch Absent: Frank Sullivan (S), Skip O’Neill (S), Pauline Murphy (S), Lorraine Sullivan (S)

ITEMS FOR DISCUSSION:

Blacktop:

Vega’s quote to blacktop portions of all of Clark Road and Beechwood is $17,310.00 at $0.75 per square foot to key in and overlay.

Grading Project:

Bill Keneally , a local resident and contractor, will provide 10 loads of reprocessed material for grading at $350/trailer plus labor and machinery.

The streets proposed for this year’s grading are (not in order of importance):

Spruce, South, Evergreen, Meadow, Orchard, Oak, Wildwood, Ledge, Summit, Dale, Azalea, Shore, 1st, 2nd, 3rd, 4th, and 5th.

RESULTS:

Clark Road:

Mark made a motion to commit a minimum of 30% of collected betterment fees with a maximum of $8,000 to be devoted to Clark Road repair annually for the next 2 years. Beth seconded the motion. A lively discussion followed. The motion was passed by an 8 to 4 majority.

Prior allocations for Clark Road work that was not done last fall, part of 2003 Financial Budget, was added to the $8,000 to bring the availability of funds for this project to $11,600.

Pat made a motion to allocate $2,000 to complete the needed funds for Clark Road alone. Beth seconded the motion. The vote was 5 to 5. As president Jim Silva cast the tie breaking vote and the motion was defeated.

Work should begin mid June.

Annual Grading Project:

Beth made a motion to allocate $4,700, with a maximum of $7,500, to grade this year’s proposed roads. Nancy seconded the motion. Passed by all. Dave agreed to locate the drain at 2nd and Shore Ave to correct the problem drainage in this area.

Other Paved Roads:

Beth made a motion to allocate $2,000 to overlay the problem areas on Birch and Beechwood. Justin seconded the motion. The motion was passed by all.

The work will be done at the same time as the paving on Clark Road.

Steve King, 4 Helen St., volunteered to use his asphalt cutter when needed. Thank you Steve, volunteers are few and greatly appreciated.

The meeting was adjourned at 11:10.

Enter content here

Enter content here

Enter content here

Have questions or comments ?
Write the WEBMASTER with the information mailto:clarkshoresassociation@hotmail.com